"This process is intended for temporary structures that will be built for a week or less. Students can petition to leave structures up for up to one additional week. Longer term or semi-permanent structures need to be approved through the Art Committee... If it becomes necessary for Physical Plant to remove a structure, the student's business account will be billed for staff hours worked and for disposal costs after consultation with the student senate leadership." (from Registration & Guidelines published on the Griffin Exchange, downloaded & printed on 4/13/2005--mtk)
File — Box: 036
Scope and Contents
From the Collection:
The Buildings and Grounds collection includes a wide range of materials from various individuals and departments concerning the Reed College campus. This collection includes blueprints, letters, and other documents concerning Reed's architecture and geography.
Dates
- Creation: 1911-2007
Creator
- From the Collection: Reed College. Facilities Services (Organization)
Extent
From the Collection: 19 Linear Feet (41 manuscript boxes)
Language of Materials
From the Collection: English
Repository Details
Part of the Reed College Special Collections and Archives Repository
Contact:
3203 Southeast Woodstock Boulevard
Portland Oregon 97202-8199 United States
archives@reed.edu
3203 Southeast Woodstock Boulevard
Portland Oregon 97202-8199 United States
archives@reed.edu